Question bank

Q&A: practice questions with answers

Search questions on any topic. Filter by exam category, exam, subject and topic, try the question, then open the answer and explanation.

Courses – airGurukul

53,050 questions in the question bank.

Read the information given below carefully and answer the questions that follow.
Six friends J, K, L, M, N and O visit a book fair on six different dates. The visits take place on either the 9th or the 24th of three months – April, August and November – of the same year. Only one friend visits on each date.
J visits in a month that has 31 days. Exactly two friends visit between J and M, and M visits after J. K and M visit in the same month. L visits before O, and both of them visit on the same date of their respective months. N visits on an odd-numbered date.
निम्नलिखित जानकारी का ध्यानपूर्वक अध्ययन कीजिए और नीचे दिए गए प्रश्नों के उत्तर दीजिए।
छह मित्र J, K, L, M, N और O छह अलग-अलग तिथियों पर एक पुस्तक मेले में जाते हैं। ये यात्राएँ एक ही वर्ष के तीन महीनों – अप्रैल, अगस्त और नवंबर – की 9 या 24 तारीख को होती हैं। प्रत्येक तिथि पर केवल एक मित्र जाता है।
J ऐसे महीने में जाता है जिसमें 31 दिन होते हैं। J और M के बीच ठीक दो मित्र जाते हैं तथा M, J के बाद जाता है। K और M एक ही महीने में जाते हैं। L, O से पहले जाता है और दोनों अपने-अपने महीने की एक ही तारीख को जाते हैं। N विषम संख्या वाली तारीख को जाता है।
Q6281.
Which of the following statements is/are true?
I. J and N visit in the same month.
II. M is the last friend to visit the fair.
III. Only one friend visits between L and O.
दिए गए कथनों में से कौन-सा/से सत्य है/हैं?
I. J और N एक ही महीने में जाते हैं।
II. M मेले में जाने वाला अंतिम मित्र है।
III. L और O के बीच केवल एक मित्र जाता है।
  1. AOnly Iकेवल I
  2. BOnly IIकेवल II
  3. COnly II and IIIकेवल II और III
  4. DOnly I and IIIकेवल I और III
  5. EAll I, II and IIII, II और III सभी
Show answer

Building the arrangement: the six slots in order are 9 Apr, 24 Apr, 9 Aug, 24 Aug, 9 Nov, 24 Nov.

• Of April (30 days), August (31 days) and November (30 days), only August has 31 days, so J visits in August.
• M is three slots after J. If J = 24 Aug, no slot is left three places later, so J = 9 Aug and M = 24 Nov.
• K is in M's month, so K = 9 Nov.
• Left: 9 Apr, 24 Apr, 24 Aug. L and O are on the same date with L first, so L = 24 Apr and O = 24 Aug.
• N gets 9 Apr, an odd date – consistent.

DateFriend
9 AprilN
24 AprilL
9 AugustJ
24 AugustO
9 NovemberK
24 NovemberM

I. J is in August and N in April – false.
II. M visits on 24 November, the last date – true.
III. Between L (24 Apr) and O (24 Aug) only J (9 Aug) visits – true.
So only II and III are true.

व्यवस्था बनाना: क्रम से छह स्थान हैं: 9 अप्रैल, 24 अप्रैल, 9 अगस्त, 24 अगस्त, 9 नवंबर, 24 नवंबर।

• अप्रैल (30 दिन), अगस्त (31 दिन) और नवंबर (30 दिन) में केवल अगस्त में 31 दिन हैं, अतः J अगस्त में जाता है।
• M, J से तीन स्थान बाद है। यदि J = 24 अगस्त हो तो तीन स्थान बाद कोई स्थान नहीं बचता, अतः J = 9 अगस्त और M = 24 नवंबर।
• K, M के महीने में है, अतः K = 9 नवंबर।
• शेष: 9 अप्रैल, 24 अप्रैल, 24 अगस्त। L और O एक ही तारीख को हैं और L पहले है, अतः L = 24 अप्रैल और O = 24 अगस्त।
• N को 9 अप्रैल मिलता है, जो विषम तारीख है – शर्त पूरी।

तिथिमित्र
9 अप्रैलN
24 अप्रैलL
9 अगस्तJ
24 अगस्तO
9 नवंबरK
24 नवंबरM

I. J अगस्त में और N अप्रैल में जाता है – असत्य।
II. M, 24 नवंबर अर्थात अंतिम तिथि को जाता है – सत्य।
III. L (24 अप्रैल) और O (24 अगस्त) के बीच केवल J (9 अगस्त) जाता है – सत्य।
अतः केवल II और III सत्य हैं।

IBPS RRB Clerk (Office Assistant) PrelimsReasoningPuzzle (Month-Date Based)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Read the information given below carefully and answer the questions that follow.
A family of seven members R, S, T, V, W, Y and Z has three generations and exactly two married couples. R is the father-in-law of W. S is the paternal grandmother of Y, who is male. T is the brother of V, who is unmarried. Z is the sister of Y. V is the paternal aunt of Z. S has only one son.
निम्नलिखित जानकारी का ध्यानपूर्वक अध्ययन कीजिए और नीचे दिए गए प्रश्नों के उत्तर दीजिए।
सात सदस्यों R, S, T, V, W, Y और Z के एक परिवार में तीन पीढ़ियाँ और ठीक दो विवाहित दंपति हैं। R, W का ससुर है। S, Y की दादी है, और Y पुरुष है। T, V का भाई है, और V अविवाहित है। Z, Y की बहन है। V, Z की बुआ है। S का केवल एक पुत्र है।
Q6282.
Four of the following five are alike in a certain way based on the given family and so form a group. Which one does not belong to that group?
दिए गए परिवार के आधार पर निम्नलिखित पाँच में से चार एक निश्चित प्रकार से समान हैं और एक समूह बनाते हैं। कौन-सा उस समूह से संबंधित नहीं है?
  1. AS
  2. BV
  3. CZ
  4. DT
  5. EW
Show answer

Building the family:
• S is the paternal grandmother of Y, so Y's father is a son of S. Z is Y's sister, so Y and Z have the same father.
• V is the paternal aunt of Z, so V is a sister of Z's father, i.e. a daughter of S. T is V's brother, so T is also a son of S. Since S has only one son, T is the father of Y and Z.
• T is married (he has children). R is the father-in-law of W, so W is married to a child of R; V is unmarried and Y, Z are the grandchildren, so W is T's wife (female) and R is T's father.
• R and S are the second married couple: R (male) and S (female) are the parents of T and V.

Generation 1: R (male) + S (female). Generation 2: T (male) + W (female); V (female, unmarried, sister of T). Generation 3: Y (male) and Z (female), children of T and W.

S, V, Z and W are all female members of the family, whereas T is male. So T does not belong to the group.

परिवार बनाना:
• S, Y की दादी है, अतः Y का पिता S का पुत्र है। Z, Y की बहन है, अतः Y और Z के पिता एक ही हैं।
• V, Z की बुआ है, अतः V, Z के पिता की बहन अर्थात S की पुत्री है। T, V का भाई है, अतः T भी S का पुत्र है। S का केवल एक पुत्र है, अतः T ही Y और Z का पिता है।
• T विवाहित है (उसकी संतानें हैं)। R, W का ससुर है, अतः W का विवाह R की किसी संतान से हुआ है; V अविवाहित है और Y, Z पोता-पोती हैं, अतः W, T की पत्नी (महिला) है और R, T का पिता है।
• दूसरा विवाहित दंपति R और S है: R (पुरुष) और S (महिला), T और V के माता-पिता हैं।

पीढ़ी 1: R (पुरुष) + S (महिला)। पीढ़ी 2: T (पुरुष) + W (महिला); V (महिला, अविवाहित, T की बहन)। पीढ़ी 3: Y (पुरुष) और Z (महिला), T और W की संतानें।

S, V, Z और W सभी परिवार की महिला सदस्य हैं, जबकि T पुरुष है। अतः T समूह से संबंधित नहीं है।

IBPS RRB Clerk (Office Assistant) PrelimsReasoningBlood RelationIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Read the information given below carefully and answer the questions that follow.
A family of seven members R, S, T, V, W, Y and Z has three generations and exactly two married couples. R is the father-in-law of W. S is the paternal grandmother of Y, who is male. T is the brother of V, who is unmarried. Z is the sister of Y. V is the paternal aunt of Z. S has only one son.
निम्नलिखित जानकारी का ध्यानपूर्वक अध्ययन कीजिए और नीचे दिए गए प्रश्नों के उत्तर दीजिए।
सात सदस्यों R, S, T, V, W, Y और Z के एक परिवार में तीन पीढ़ियाँ और ठीक दो विवाहित दंपति हैं। R, W का ससुर है। S, Y की दादी है, और Y पुरुष है। T, V का भाई है, और V अविवाहित है। Z, Y की बहन है। V, Z की बुआ है। S का केवल एक पुत्र है।
Q6283.
Which of the following statements is/are correct?
I. W is the daughter-in-law of S.
II. R is the grandfather of Z.
III. V is the sister of T's wife.
दिए गए कथनों में से कौन-सा/से सही है/हैं?
I. W, S की पुत्रवधू है।
II. R, Z का दादा है।
III. V, T की साली (पत्नी की बहन) है।
  1. AOnly I and IIकेवल I और II
  2. BOnly Iकेवल I
  3. COnly II and IIIकेवल II और III
  4. DAll I, II and IIII, II और III सभी
  5. EOnly IIIकेवल III
Show answer

Building the family:
• S is the paternal grandmother of Y, so Y's father is a son of S. Z is Y's sister, so Y and Z have the same father.
• V is the paternal aunt of Z, so V is a sister of Z's father, i.e. a daughter of S. T is V's brother, so T is also a son of S. Since S has only one son, T is the father of Y and Z.
• T is married (he has children). R is the father-in-law of W, so W is married to a child of R; V is unmarried and Y, Z are the grandchildren, so W is T's wife (female) and R is T's father.
• R and S are the second married couple: R (male) and S (female) are the parents of T and V.

Generation 1: R (male) + S (female). Generation 2: T (male) + W (female); V (female, unmarried, sister of T). Generation 3: Y (male) and Z (female), children of T and W.

I. W is the wife of S's son T – correct.
II. Z is the daughter of R's son T – correct.
III. V is T's own sister, not the sister of his wife W – incorrect.
So only I and II are correct.

परिवार बनाना:
• S, Y की दादी है, अतः Y का पिता S का पुत्र है। Z, Y की बहन है, अतः Y और Z के पिता एक ही हैं।
• V, Z की बुआ है, अतः V, Z के पिता की बहन अर्थात S की पुत्री है। T, V का भाई है, अतः T भी S का पुत्र है। S का केवल एक पुत्र है, अतः T ही Y और Z का पिता है।
• T विवाहित है (उसकी संतानें हैं)। R, W का ससुर है, अतः W का विवाह R की किसी संतान से हुआ है; V अविवाहित है और Y, Z पोता-पोती हैं, अतः W, T की पत्नी (महिला) है और R, T का पिता है।
• दूसरा विवाहित दंपति R और S है: R (पुरुष) और S (महिला), T और V के माता-पिता हैं।

पीढ़ी 1: R (पुरुष) + S (महिला)। पीढ़ी 2: T (पुरुष) + W (महिला); V (महिला, अविवाहित, T की बहन)। पीढ़ी 3: Y (पुरुष) और Z (महिला), T और W की संतानें।

I. W, S के पुत्र T की पत्नी है – सही।
II. Z, R के पुत्र T की पुत्री है – सही।
III. V, T की सगी बहन है, उसकी पत्नी W की बहन (साली) नहीं – गलत।
अतः केवल I और II सही हैं।

IBPS RRB Clerk (Office Assistant) PrelimsReasoningBlood RelationIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Read the information given below carefully and answer the questions that follow.
A family of seven members R, S, T, V, W, Y and Z has three generations and exactly two married couples. R is the father-in-law of W. S is the paternal grandmother of Y, who is male. T is the brother of V, who is unmarried. Z is the sister of Y. V is the paternal aunt of Z. S has only one son.
निम्नलिखित जानकारी का ध्यानपूर्वक अध्ययन कीजिए और नीचे दिए गए प्रश्नों के उत्तर दीजिए।
सात सदस्यों R, S, T, V, W, Y और Z के एक परिवार में तीन पीढ़ियाँ और ठीक दो विवाहित दंपति हैं। R, W का ससुर है। S, Y की दादी है, और Y पुरुष है। T, V का भाई है, और V अविवाहित है। Z, Y की बहन है। V, Z की बुआ है। S का केवल एक पुत्र है।
Q6284.
How is Y related to V?
Y, V से किस प्रकार संबंधित है?
  1. ASonपुत्र
  2. BBrotherभाई
  3. CNephewभतीजा
  4. DCousinचचेरा भाई
  5. EGrandsonपोता
Show answer

Building the family:
• S is the paternal grandmother of Y, so Y's father is a son of S. Z is Y's sister, so Y and Z have the same father.
• V is the paternal aunt of Z, so V is a sister of Z's father, i.e. a daughter of S. T is V's brother, so T is also a son of S. Since S has only one son, T is the father of Y and Z.
• T is married (he has children). R is the father-in-law of W, so W is married to a child of R; V is unmarried and Y, Z are the grandchildren, so W is T's wife (female) and R is T's father.
• R and S are the second married couple: R (male) and S (female) are the parents of T and V.

Generation 1: R (male) + S (female). Generation 2: T (male) + W (female); V (female, unmarried, sister of T). Generation 3: Y (male) and Z (female), children of T and W.

Y is the son of T, and T is V's brother. The son of one's brother is one's nephew, so Y is the nephew of V.

परिवार बनाना:
• S, Y की दादी है, अतः Y का पिता S का पुत्र है। Z, Y की बहन है, अतः Y और Z के पिता एक ही हैं।
• V, Z की बुआ है, अतः V, Z के पिता की बहन अर्थात S की पुत्री है। T, V का भाई है, अतः T भी S का पुत्र है। S का केवल एक पुत्र है, अतः T ही Y और Z का पिता है।
• T विवाहित है (उसकी संतानें हैं)। R, W का ससुर है, अतः W का विवाह R की किसी संतान से हुआ है; V अविवाहित है और Y, Z पोता-पोती हैं, अतः W, T की पत्नी (महिला) है और R, T का पिता है।
• दूसरा विवाहित दंपति R और S है: R (पुरुष) और S (महिला), T और V के माता-पिता हैं।

पीढ़ी 1: R (पुरुष) + S (महिला)। पीढ़ी 2: T (पुरुष) + W (महिला); V (महिला, अविवाहित, T की बहन)। पीढ़ी 3: Y (पुरुष) और Z (महिला), T और W की संतानें।

Y, T का पुत्र है और T, V का भाई है। भाई का पुत्र भतीजा होता है, अतः Y, V का भतीजा है।

IBPS RRB Clerk (Office Assistant) PrelimsReasoningBlood RelationIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Q6285.
Consider the word 'CHANGE'. Count the letter pairs that have exactly as many letters between them in the word as between them in the English alphabet (in forward or backward order). What is the count?
शब्द 'CHANGE' में ऐसे कितने अक्षर-युग्म हैं, जिनमें से प्रत्येक के बीच शब्द में उतने ही अक्षर हैं जितने अंग्रेज़ी वर्णमाला में उनके बीच होते हैं (आगे और पीछे दोनों दिशाओं में)?
  1. AOneएक
  2. BThreeतीन
  3. CNoneकोई नहीं
  4. DMore than threeतीन से अधिक
  5. ETwoदो
Show answer

Key idea: write the alphabet positions and compare the gap in the word with the gap in the alphabet.

C = 3, H = 8, A = 1, N = 14, G = 7, E = 5.
• C and A: one letter (H) between them in the word; one letter (B) between them in the alphabet – valid.
• C and G: three letters (H, A, N) between them in the word; three letters (D, E, F) between them in the alphabet – valid.
• Every other pair (for example H–G, N–G, G–E, A–E, H–E) has a different gap in the word and in the alphabet.

So there are two such pairs: CA and CG.

मुख्य विचार: अक्षरों के वर्णमाला स्थान लिखें और शब्द में अंतर की तुलना वर्णमाला में अंतर से करें।

C = 3, H = 8, A = 1, N = 14, G = 7, E = 5।
• C और A: शब्द में इनके बीच एक अक्षर (H); वर्णमाला में इनके बीच एक अक्षर (B) – मान्य।
• C और G: शब्द में इनके बीच तीन अक्षर (H, A, N); वर्णमाला में इनके बीच तीन अक्षर (D, E, F) – मान्य।
• अन्य प्रत्येक युग्म (जैसे H–G, N–G, G–E, A–E, H–E) में शब्द और वर्णमाला का अंतर अलग है।

अतः ऐसे दो युग्म हैं: CA और CG।

IBPS RRB Clerk (Office Assistant) PrelimsReasoningLetter Pairs in a WordIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below lists, for five hotels A, B, C, D and E, how many rooms each hotel has and how many guests stayed there on one particular night. Every room of each hotel is occupied.

HotelNumber of roomsNumber of guests
A3690
B50120
C48132
D40104
E55154

नीचे दी गई तालिका किसी एक रात पाँच होटलों A, B, C, D और E में कमरों की कुल संख्या तथा ठहरे हुए अतिथियों की कुल संख्या दर्शाती है। प्रत्येक होटल का हर कमरा भरा हुआ है।

होटलकमरों की संख्याअतिथियों की संख्या
A3690
B50120
C48132
D40104
E55154
Q6286.
In Hotel D, 34 of the rooms are taken by a wedding party of 74 guests. On average, how many guests are staying in each of the other rooms of Hotel D?
होटल D में 34 कमरे 74 अतिथियों वाली एक विवाह पार्टी ने लिए हैं। होटल D के शेष कमरों में प्रति कमरा अतिथियों की औसत संख्या कितनी है?
  1. A3
  2. B3.5
  3. C2.5
  4. D2.6
  5. E2
Show answer

Rooms taken by the party =34×40=30, so remaining rooms =40−30=10.
Remaining guests =104−74=30.
Average guests per remaining room =3010=3.

पार्टी द्वारा लिए गए कमरे =34×40=30, अतः शेष कमरे =40−30=10।
शेष अतिथि =104−74=30।
शेष कमरों में प्रति कमरा औसत अतिथि =3010=3।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below lists, for five hotels A, B, C, D and E, how many rooms each hotel has and how many guests stayed there on one particular night. Every room of each hotel is occupied.

HotelNumber of roomsNumber of guests
A3690
B50120
C48132
D40104
E55154

नीचे दी गई तालिका किसी एक रात पाँच होटलों A, B, C, D और E में कमरों की कुल संख्या तथा ठहरे हुए अतिथियों की कुल संख्या दर्शाती है। प्रत्येक होटल का हर कमरा भरा हुआ है।

होटलकमरों की संख्याअतिथियों की संख्या
A3690
B50120
C48132
D40104
E55154
Q6287.
What is the average number of guests staying in Hotels A, B and C taken together?
होटल A, B और C में ठहरे अतिथियों की औसत संख्या कितनी है?
  1. A120
  2. B112
  3. C108
  4. D114
  5. E118
Show answer

Total guests in A, B and C =90+120+132=342.
Average =3423=114.

A, B और C में कुल अतिथि =90+120+132=342।
औसत =3423=114।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below lists, for five hotels A, B, C, D and E, how many rooms each hotel has and how many guests stayed there on one particular night. Every room of each hotel is occupied.

HotelNumber of roomsNumber of guests
A3690
B50120
C48132
D40104
E55154

नीचे दी गई तालिका किसी एक रात पाँच होटलों A, B, C, D और E में कमरों की कुल संख्या तथा ठहरे हुए अतिथियों की कुल संख्या दर्शाती है। प्रत्येक होटल का हर कमरा भरा हुआ है।

होटलकमरों की संख्याअतिथियों की संख्या
A3690
B50120
C48132
D40104
E55154
Q6288.
Find the ratio of guests per room in Hotel B to guests per room in Hotel E.
होटल B में प्रति कमरा अतिथियों की संख्या और होटल E में प्रति कमरा अतिथियों की संख्या का अनुपात क्या है?
  1. A6 : 7
  2. B7 : 8
  3. C5 : 6
  4. D12 : 11
  5. E7 : 6
Show answer

Guests per room in B =12050=2.4.
Guests per room in E =15455=2.8.
Required ratio =2.4:2.8=24:28=6:7.

B में प्रति कमरा अतिथि =12050=2.4।
E में प्रति कमरा अतिथि =15455=2.8।
अभीष्ट अनुपात =2.4:2.8=24:28=6:7।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below lists, for five hotels A, B, C, D and E, how many rooms each hotel has and how many guests stayed there on one particular night. Every room of each hotel is occupied.

HotelNumber of roomsNumber of guests
A3690
B50120
C48132
D40104
E55154

नीचे दी गई तालिका किसी एक रात पाँच होटलों A, B, C, D और E में कमरों की कुल संख्या तथा ठहरे हुए अतिथियों की कुल संख्या दर्शाती है। प्रत्येक होटल का हर कमरा भरा हुआ है।

होटलकमरों की संख्याअतिथियों की संख्या
A3690
B50120
C48132
D40104
E55154
Q6289.
A new hotel F has as many rooms as the average number of rooms of Hotels A and C, and the number of guests in F is 40% more than the number of guests in Hotel A. By how much does the average number of guests per room in Hotel F exceed that in Hotel A?
एक नए होटल F के कमरे, होटल A तथा C के कमरों के औसत जितने हैं, तथा F में अतिथियों की संख्या होटल A के अतिथियों से 40% अधिक है। होटल F में प्रति कमरा अतिथियों की औसत संख्या, होटल A की तुलना में कितनी अधिक है?
  1. A0.4
  2. B0.5
  3. C0.25
  4. D1
  5. E0.75
Show answer

Rooms in F =36+482=42.
Guests in F =90×140100=126.
Guests per room in F =12642=3; in A =9036=2.5.
Difference =3−2.5=0.5.

F में कमरे =36+482=42।
F में अतिथि =90×140100=126।
F में प्रति कमरा अतिथि =12642=3; A में =9036=2.5।
अंतर =3−2.5=0.5।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below lists, for five hotels A, B, C, D and E, how many rooms each hotel has and how many guests stayed there on one particular night. Every room of each hotel is occupied.

HotelNumber of roomsNumber of guests
A3690
B50120
C48132
D40104
E55154

नीचे दी गई तालिका किसी एक रात पाँच होटलों A, B, C, D और E में कमरों की कुल संख्या तथा ठहरे हुए अतिथियों की कुल संख्या दर्शाती है। प्रत्येक होटल का हर कमरा भरा हुआ है।

होटलकमरों की संख्याअतिथियों की संख्या
A3690
B50120
C48132
D40104
E55154
Q6290.
For the night, Hotel C charges ₹1,500 per room plus ₹200 per guest, while Hotel E charges ₹1,200 per room plus ₹250 per guest. By how much do the total collections of the two hotels differ?
उस रात होटल C प्रति कमरा ₹1,500 तथा प्रति अतिथि ₹200 लेता है, जबकि होटल E प्रति कमरा ₹1,200 तथा प्रति अतिथि ₹250 लेता है। दोनों होटलों द्वारा प्राप्त कुल राशियों का अंतर कितना है?
  1. A₹6,100
  2. B₹7,100
  3. C₹5,800
  4. D₹5,500
  5. E₹6,600
Show answer

Hotel C: 48×1500+132×200=72000+26400=₹98,400.
Hotel E: 55×1200+154×250=66000+38500=₹1,04,500.
Difference =104500−98400=₹6,100.

होटल C: 48×1500+132×200=72000+26400=₹98,400।
होटल E: 55×1200+154×250=66000+38500=₹1,04,500।
अंतर =104500−98400=₹6,100।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below shows the number of projects handled by five project managers P, Q, R, S and T of a construction firm, and the average cost per project (in ₹ lakh) for each of them. Total cost of a manager = Number of projects × Average cost per project.

ManagerNumber of projectsAverage cost per project (₹ lakh)
P4845
Q4255
R3564
S5042
T4450

नीचे दी गई तालिका एक निर्माण कंपनी के पाँच परियोजना प्रबंधकों P, Q, R, S और T द्वारा संभाली गई परियोजनाओं की संख्या तथा प्रत्येक की प्रति परियोजना औसत लागत (₹ लाख में) दर्शाती है। किसी प्रबंधक की कुल लागत = परियोजनाओं की संख्या × प्रति परियोजना औसत लागत।

प्रबंधकपरियोजनाओं की संख्याप्रति परियोजना औसत लागत (₹ लाख)
P4845
Q4255
R3564
S5042
T4450
Q6291.
A new manager U handles as many projects as the average of the projects handled by P and S, and his average cost per project equals the average of the average costs per project of Q and T. What is the total cost of the projects handled by U?
एक नया प्रबंधक U उतनी परियोजनाएँ संभालता है जितनी P और S द्वारा संभाली गई परियोजनाओं का औसत है, तथा उसकी प्रति परियोजना औसत लागत, Q और T की प्रति परियोजना औसत लागतों के औसत के बराबर है। U द्वारा संभाली गई परियोजनाओं की कुल लागत कितनी है?
  1. A₹2,548 lakh₹2,548 लाख
  2. B₹2,621.5 lakh₹2,621.5 लाख
  3. C₹2,604 lakh₹2,604 लाख
  4. D₹2,572.5 lakh₹2,572.5 लाख
  5. E₹2,499 lakh₹2,499 लाख
Show answer

Projects of U =48+502=49.
Average cost per project of U =55+502=₹52.5 lakh.
Total cost of U =49×52.5=₹2,572.5 lakh.

U की परियोजनाएँ =48+502=49।
U की प्रति परियोजना औसत लागत =55+502=₹52.5 लाख।
U की कुल लागत =49×52.5=₹2,572.5 लाख।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below shows the number of projects handled by five project managers P, Q, R, S and T of a construction firm, and the average cost per project (in ₹ lakh) for each of them. Total cost of a manager = Number of projects × Average cost per project.

ManagerNumber of projectsAverage cost per project (₹ lakh)
P4845
Q4255
R3564
S5042
T4450

नीचे दी गई तालिका एक निर्माण कंपनी के पाँच परियोजना प्रबंधकों P, Q, R, S और T द्वारा संभाली गई परियोजनाओं की संख्या तथा प्रत्येक की प्रति परियोजना औसत लागत (₹ लाख में) दर्शाती है। किसी प्रबंधक की कुल लागत = परियोजनाओं की संख्या × प्रति परियोजना औसत लागत।

प्रबंधकपरियोजनाओं की संख्याप्रति परियोजना औसत लागत (₹ लाख)
P4845
Q4255
R3564
S5042
T4450
Q6292.
By what percentage is the total cost of the projects handled by Q more or less than the total cost of the projects handled by S?
Q द्वारा संभाली गई परियोजनाओं की कुल लागत, S द्वारा संभाली गई परियोजनाओं की कुल लागत से कितने प्रतिशत अधिक या कम है?
  1. A12.5% more12.5% अधिक
  2. B10% more10% अधिक
  3. C9.09% less9.09% कम
  4. D10% less10% कम
  5. E9.09% more9.09% अधिक
Show answer

Total cost of Q =42×55=₹2,310 lakh.
Total cost of S =50×42=₹2,100 lakh.
Q is more by 2310−21002100×100=2102100×100=10%.

Q की कुल लागत =42×55=₹2,310 लाख।
S की कुल लागत =50×42=₹2,100 लाख।
Q अधिक है: 2310−21002100×100=2102100×100=10%।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below shows the number of projects handled by five project managers P, Q, R, S and T of a construction firm, and the average cost per project (in ₹ lakh) for each of them. Total cost of a manager = Number of projects × Average cost per project.

ManagerNumber of projectsAverage cost per project (₹ lakh)
P4845
Q4255
R3564
S5042
T4450

नीचे दी गई तालिका एक निर्माण कंपनी के पाँच परियोजना प्रबंधकों P, Q, R, S और T द्वारा संभाली गई परियोजनाओं की संख्या तथा प्रत्येक की प्रति परियोजना औसत लागत (₹ लाख में) दर्शाती है। किसी प्रबंधक की कुल लागत = परियोजनाओं की संख्या × प्रति परियोजना औसत लागत।

प्रबंधकपरियोजनाओं की संख्याप्रति परियोजना औसत लागत (₹ लाख)
P4845
Q4255
R3564
S5042
T4450
Q6293.
Manager R earned a total revenue of ₹2,576 lakh from his projects, while manager T earned a profit of 12% on his total cost. Find the difference between the profits earned by R and T.
प्रबंधक R ने अपनी परियोजनाओं से कुल ₹2,576 लाख का राजस्व अर्जित किया, जबकि प्रबंधक T ने अपनी कुल लागत पर 12% लाभ अर्जित किया। R और T द्वारा अर्जित लाभों का अंतर ज्ञात कीजिए।
  1. A₹72 lakh₹72 लाख
  2. B₹56 lakh₹56 लाख
  3. C₹84 lakh₹84 लाख
  4. D₹64 lakh₹64 लाख
  5. E₹96 lakh₹96 लाख
Show answer

Total cost of R =35×64=₹2,240 lakh, so profit of R =2576−2240=₹336 lakh.
Total cost of T =44×50=₹2,200 lakh, so profit of T =12% of 2200=₹264 lakh.
Difference =336−264=₹72 lakh.

R की कुल लागत =35×64=₹2,240 लाख, अतः R का लाभ =2576−2240=₹336 लाख।
T की कुल लागत =44×50=₹2,200 लाख, अतः T का लाभ =2200 का 12%=₹264 लाख।
अंतर =336−264=₹72 लाख।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below shows the number of projects handled by five project managers P, Q, R, S and T of a construction firm, and the average cost per project (in ₹ lakh) for each of them. Total cost of a manager = Number of projects × Average cost per project.

ManagerNumber of projectsAverage cost per project (₹ lakh)
P4845
Q4255
R3564
S5042
T4450

नीचे दी गई तालिका एक निर्माण कंपनी के पाँच परियोजना प्रबंधकों P, Q, R, S और T द्वारा संभाली गई परियोजनाओं की संख्या तथा प्रत्येक की प्रति परियोजना औसत लागत (₹ लाख में) दर्शाती है। किसी प्रबंधक की कुल लागत = परियोजनाओं की संख्या × प्रति परियोजना औसत लागत।

प्रबंधकपरियोजनाओं की संख्याप्रति परियोजना औसत लागत (₹ लाख)
P4845
Q4255
R3564
S5042
T4450
Q6294.
Of the projects handled by P, 25% are "urgent" and the rest are "regular". Each urgent project costs 20% more than P's average cost per project, and each regular project costs ₹x lakh. If P's average cost per project stays as given in the table, find x.
P द्वारा संभाली गई परियोजनाओं में से 25% "अत्यावश्यक" हैं और शेष "सामान्य" हैं। प्रत्येक अत्यावश्यक परियोजना की लागत P की प्रति परियोजना औसत लागत से 20% अधिक है, तथा प्रत्येक सामान्य परियोजना की लागत ₹x लाख है। यदि P की प्रति परियोजना औसत लागत तालिका के अनुसार ही रहती है, तो x ज्ञात कीजिए।
  1. A41
  2. B42
  3. C40.5
  4. D44
  5. E43.5
Show answer

Urgent projects =25% of 48=12; regular projects =48−12=36.
Cost of each urgent project =45×1.2=₹54 lakh.
Total cost of P =48×45=₹2,160 lakh.
12×54+36x=2160⇒648+36x=2160⇒36x=1512⇒x=42.

अत्यावश्यक परियोजनाएँ =48 का 25%=12; सामान्य परियोजनाएँ =48−12=36।
प्रत्येक अत्यावश्यक परियोजना की लागत =45×1.2=₹54 लाख।
P की कुल लागत =48×45=₹2,160 लाख।
12×54+36x=2160⇒648+36x=2160⇒36x=1512⇒x=42।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →

The table below shows the number of projects handled by five project managers P, Q, R, S and T of a construction firm, and the average cost per project (in ₹ lakh) for each of them. Total cost of a manager = Number of projects × Average cost per project.

ManagerNumber of projectsAverage cost per project (₹ lakh)
P4845
Q4255
R3564
S5042
T4450

नीचे दी गई तालिका एक निर्माण कंपनी के पाँच परियोजना प्रबंधकों P, Q, R, S और T द्वारा संभाली गई परियोजनाओं की संख्या तथा प्रत्येक की प्रति परियोजना औसत लागत (₹ लाख में) दर्शाती है। किसी प्रबंधक की कुल लागत = परियोजनाओं की संख्या × प्रति परियोजना औसत लागत।

प्रबंधकपरियोजनाओं की संख्याप्रति परियोजना औसत लागत (₹ लाख)
P4845
Q4255
R3564
S5042
T4450
Q6295.
What is the ratio of the total cost of the projects handled by P to the total cost of the projects handled by T?
P द्वारा संभाली गई परियोजनाओं की कुल लागत और T द्वारा संभाली गई परियोजनाओं की कुल लागत का अनुपात क्या है?
  1. A55 : 54
  2. B27 : 28
  3. C54 : 55
  4. D49 : 50
  5. E52 : 55
Show answer

Total cost of P =48×45=₹2,160 lakh.
Total cost of T =44×50=₹2,200 lakh.
Ratio =2160:2200=54:55.

P की कुल लागत =48×45=₹2,160 लाख।
T की कुल लागत =44×50=₹2,200 लाख।
अनुपात =2160:2200=54:55।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityData Interpretation (Table)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Q6296.
In a toy shop, the number of red balls is 50% more than the number of blue balls, and the number of green balls is 20% less than the number of red balls. If the shop has 555 balls of these three colours in all, how many green balls are there?
एक खिलौने की दुकान में लाल गेंदों की संख्या नीली गेंदों की संख्या से 50% अधिक है, तथा हरी गेंदों की संख्या लाल गेंदों की संख्या से 20% कम है। यदि दुकान में इन तीनों रंगों की कुल 555 गेंदें हैं, तो हरी गेंदें कितनी हैं?
  1. A170
  2. B200
  3. C225
  4. D180
  5. E150
Show answer

Let blue balls =100x. Then red =150x and green =150x×0.8=120x.
Total =100x+150x+120x=370x=555⇒x=1.5.
Green balls =120×1.5=180.

माना नीली गेंदें =100x। तब लाल =150x तथा हरी =150x×0.8=120x।
कुल =100x+150x+120x=370x=555⇒x=1.5।
हरी गेंदें =120×1.5=180।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityPercentageIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Q6297.
Three cans A, B and C together hold 28 litres of milk, divided among them in the ratio 4 : 1 : 2. After 4 litres of milk is poured into can B, what is the ratio of the milk in A, B and C?
तीन डिब्बों A, B और C में कुल 28 लीटर दूध 4 : 1 : 2 के अनुपात में भरा है। डिब्बे B में 4 लीटर दूध और डालने के बाद A, B और C में दूध का अनुपात क्या होगा?
  1. A4 : 3 : 2
  2. B3 : 2 : 2
  3. C2 : 1 : 1
  4. D4 : 2 : 3
  5. E2 : 1 : 2
Show answer

Sum of ratio terms =4+1+2=7, so one part =287=4 litres.
A =16 L, B =4 L, C =8 L.
After adding 4 L to B: B =8 L.
New ratio =16:8:8=2:1:1.

अनुपात के पदों का योग =4+1+2=7, अतः एक भाग =287=4 लीटर।
A =16 ली., B =4 ली., C =8 ली.।
B में 4 ली. डालने के बाद: B =8 ली.।
नया अनुपात =16:8:8=2:1:1।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityRatio & ProportionIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Q6298.
Rohan and Kavya have equal sums of money. Rohan lends his sum at 7% p.a. simple interest and Kavya lends hers at 11% p.a. simple interest, both for 3 years. If they earn ₹8,100 as interest in all, how much money did Kavya lend?
रोहन और काव्या के पास बराबर धनराशि है। रोहन अपनी राशि 7% वार्षिक साधारण ब्याज पर तथा काव्या अपनी राशि 11% वार्षिक साधारण ब्याज पर, दोनों 3 वर्ष के लिए उधार देते हैं। यदि उन्हें कुल ₹8,100 ब्याज प्राप्त होता है, तो काव्या ने कितनी राशि उधार दी?
  1. A₹13,500
  2. B₹12,000
  3. C₹16,200
  4. D₹15,000
  5. E₹18,000
Show answer

Let each sum be ₹P.
Interest of Rohan =P×7×3100=0.21P; interest of Kavya =P×11×3100=0.33P.
0.21P+0.33P=0.54P=8100⇒P=81000.54=15000.
Kavya lent ₹15,000.

माना प्रत्येक की राशि ₹P है।
रोहन का ब्याज =P×7×3100=0.21P; काव्या का ब्याज =P×11×3100=0.33P।
0.21P+0.33P=0.54P=8100⇒P=81000.54=15000।
काव्या ने ₹15,000 उधार दिए।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilitySimple InterestIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Q6299.
Arjun and Meera start a business with a combined capital of ₹84,000. Arjun withdraws all his capital after 9 months, while Meera keeps hers in the business for the whole year. If they receive equal shares of the annual profit, how much did Arjun invest?
अर्जुन और मीरा कुल ₹84,000 की पूँजी से एक व्यवसाय शुरू करते हैं। अर्जुन 9 महीने बाद अपनी पूरी पूँजी निकाल लेता है, जबकि मीरा पूरे वर्ष अपनी पूँजी व्यवसाय में लगाए रखती है। यदि दोनों को वार्षिक लाभ में बराबर हिस्सा मिलता है, तो अर्जुन ने कितनी पूँजी लगाई थी?
  1. A₹45,000
  2. B₹48,000
  3. C₹36,000
  4. D₹42,000
  5. E₹50,400
Show answer

Equal profit shares means capital × time is equal for both.
Arjun ×9= Meera ×12⇒ Arjun : Meera =12:9=4:3.
Arjun's capital =47×84000=₹48,000.

लाभ में बराबर हिस्से का अर्थ है कि दोनों के लिए पूँजी × समय बराबर है।
अर्जुन ×9= मीरा ×12⇒ अर्जुन : मीरा =12:9=4:3।
अर्जुन की पूँजी =47×84000=₹48,000।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilityPartnershipIBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →
Q6300.
Running at 54 km/h, a train passes a platform completely in 24 seconds. If the platform is 80 m longer than the train, what is the length of the train?
54 किमी/घंटा की चाल से चलती हुई एक रेलगाड़ी एक प्लेटफॉर्म को 24 सेकंड में पूरी तरह पार कर लेती है। यदि प्लेटफॉर्म रेलगाड़ी से 80 मीटर लंबा है, तो रेलगाड़ी की लंबाई कितनी है?
  1. A160 m160 मीटर
  2. B140 m140 मीटर
  3. C120 m120 मीटर
  4. D180 m180 मीटर
  5. E220 m220 मीटर
Show answer

Speed =54×518=15 m/s.
Distance covered = train + platform =15×24=360 m.
Let train =L; then L+(L+80)=360⇒2L=280⇒L=140 m.

चाल =54×518=15 मी/से।
तय दूरी = रेलगाड़ी + प्लेटफॉर्म =15×24=360 मीटर।
माना रेलगाड़ी की लंबाई =L; तब L+(L+80)=360⇒2L=280⇒L=140 मीटर।

IBPS RRB Clerk (Office Assistant) PrelimsNumerical AbilitySpeed, Time & Distance (Train)IBPS RRB Clerk (Office Assistant) Prelims 2025 · 7 Dec Shift 2 →